Location: Stuarts Draft, Virginia
Contractor: Nielsen Builders
Description: 
The $5.3 million Hollister 46,000 sq. ft. addition utilized tilt up construction using sandwich panels with the Thermomass insulation system. The addition is used for material storage and product shipment. Hollister’s previous loading dock area became the new location for their machine shop. Once the old machine shop space became available a new cafeteria was constructed in that area. After the completion of the cafeteria, the old cafeteria was converted to new office space equipped with both stud wall and cubicle style offices.